The project is a commercial resort pool in need of pre-construction helical piers for the main pool and pool deck area. Challenge • Soil conditions in FEMA flood zone Solution Helicon worked alongside the geotechnical design team to develop a pre-construction helical...
The permeation grout project is at the NASA Kennedy Space Center in Cape Canaveral, FL. This project consisted of ground improvement for a heavily loaded slap stand structure that will be constructed along the transfer aisle between Highbays 3 & 4 in the Vehicle...
The project is a commercial retail building. The Geotechnical Engineer of Record recommended a deep foundation solution of helical piers to improve prove the load bearing capacity of the existing soils at the site. Challenge • Sandy/Silty soil conditions Solution...
Vibro stone columns offer general contractors in the State of Florida, a more sustainable and economical alternative for solid commercial deep foundations as opposed to deep and piling foundation solutions. They are designed with complex engineering techniques and...
The compaction grout project is a nuclear power plant located in Crystal River, FL. This project consisted of the design and construction of a new Wastewater Treatment (WWT) system for flue gas desulfurization (FDG) blowdown water prior to disposal into the existing...