The permeation grout project is at the NASA Kennedy Space Center in Cape Canaveral, FL. This project consisted of ground improvement for a heavily loaded slap stand structure that will be constructed along the transfer aisle between Highbays 3 & 4 in the Vehicle...
A shifting foundation is the last thing that most homeowners in Florida want to deal with. However, failure to repair the problem can lead to a variety of other issues. While some states in the US are subjected to ice and snow, Florida is adversely affected by...
The project is a commercial retail building. The Geotechnical Engineer of Record recommended a deep foundation solution of helical piers to improve prove the load bearing capacity of the existing soils at the site. Challenge • Sandy/Silty soil conditions Solution...
Vibro stone columns offer general contractors in the State of Florida, a more sustainable and economical alternative for solid commercial deep foundations as opposed to deep and piling foundation solutions. They are designed with complex engineering techniques and...
The compaction grout project is a nuclear power plant located in Crystal River, FL. This project consisted of the design and construction of a new Wastewater Treatment (WWT) system for flue gas desulfurization (FDG) blowdown water prior to disposal into the existing...
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.