Proudly serving all of Florida with offices in Tampa, Orlando, and Fort Myers

Vibro Stone Columns: Assisted Living Facility, Wesley Chapel, FL

by | May 29, 2019

[cs_content][cs_element_section _id=”1″ ][cs_element_row _id=”2″ ][cs_element_column _id=”3″ ][cs_element_headline _id=”4″ ][cs_content_seo]Blue Heron Health & Rehab Project\n\n[/cs_content_seo][/cs_element_column][/cs_element_row][/cs_element_section][cs_element_section _id=”5″ ][cs_element_row _id=”6″ ][cs_element_column _id=”7″ ][cs_element_video _id=”8″ ][cs_element_gap _id=”9″ ][/cs_element_column][cs_element_column _id=”10″ ][cs_element_headline _id=”11″ ][cs_content_seo]Wesley Chapel, FL\n\n[/cs_content_seo][cs_element_gap _id=”12″ ][cs_element_text _id=”13″ ][cs_content_seo]CLIENT: The Douglas Company
ENGINEER: Mortensen Engineering
MARKET: Institutional
SOLUTION: Ground Improvement
SERVICES: Compaction Grout, Vibro \n\n[/cs_content_seo][cs_element_gap _id=”14″ ][cs_element_headline _id=”15″ ][cs_content_seo]Ground improvement for a 57,600 square-foot building\n\n[/cs_content_seo][cs_element_headline _id=”16″ ][cs_content_seo]21 Compaction Grout Injection Points\n\n[/cs_content_seo][cs_element_headline _id=”17″ ][cs_content_seo]394 Vibro-Replacement Stone Columns\n\n[/cs_content_seo][cs_element_gap _id=”18″ ][cs_element_button _id=”19″ ][cs_content_seo]Project PDF\n\n[/cs_content_seo][cs_element_social _id=”20″ ][cs_element_social _id=”21″ ][cs_element_social _id=”22″ ][cs_element_social _id=”23″ ][/cs_element_column][/cs_element_row][/cs_element_section][cs_element_section _id=”24″ ][cs_element_layout_row _id=”25″ ][cs_element_layout_column _id=”26″ ][cs_element_text _id=”27″ ][cs_content_seo]Project\n\n[/cs_content_seo][cs_element_text _id=”28″ ][cs_content_seo]The project is a new Health & Rehabilitation facility in the Seven Oaks Community, located in Wesley Chapel, Pasco County. The structure is approximately 57,600 square‐foot building with associated roadway, pavement & parking areas. Due to the presence of loose to medium‐dense fine sands to slightly clayey fine sands in the upper 25 feet, the Geotechnical Engineer of Record recommended a ground improvement program for Vibro‐Replacement Stone Columns (VSC). In addition, because of the presence of overburden soil erosion/raveling evidence related to possible “sinkhole conditions”, the Geotechnical EOR recommended a Compaction Grouting (CG) program to mitigate the concerns.\n\n[/cs_content_seo][/cs_element_layout_column][/cs_element_layout_row][/cs_element_section][cs_element_section _id=”29″ ][cs_element_layout_row _id=”30″ ][cs_element_layout_column _id=”31″ ][cs_element_text _id=”32″ ][cs_content_seo]Challenge\n\n[/cs_content_seo][cs_element_text _id=”33″ ][cs_content_seo]The challenges encountered during VSC installation were minimal:• Limited movement around the site, due to ongoing site conditions• Weather conditions were unfavorable and slowed production\n\n[/cs_content_seo][/cs_element_layout_column][/cs_element_layout_row][/cs_element_section][cs_element_section _id=”34″ ][cs_element_layout_row _id=”35″ ][cs_element_layout_column _id=”36″ ][cs_element_text _id=”37″ ][cs_content_seo]Solution\n\n[/cs_content_seo][cs_element_text _id=”38″ ][cs_content_seo]Helicon followed the Compaction Grout (CG) parameters, provided by the Geotechnical Engineer of Record, during the installation. Our crew installed (21) grout injection points to approximately 30‐50 feet. Helicon also worked alongside the general contractor & the geotechnical/structural design teams, to develop a cost‐conscious Vibro‐Replacement design submittal. The VSC Program was designed to meet the design load criteria of 6,000 psf allowable. Helicon’s VSC crew worked approx. 10‐hour shifts for up to six days a week, in order to meet the client’s critical path schedule. Efficient planning & coordination was key to overcoming the challenges & limitations. (394) Vibro‐Replacement Stone Columns (VSC) were installed from site grade to depths ranging from 10‐ft to 25‐ft. Helicon collaborated with the Geotechnical Engineer of Record throughout the work and confirmed all recommended criteria werefollowed. The CG & VSC work was successfully completed in just (12) days and finished on‐time and within budget.\n\n[/cs_content_seo][/cs_element_layout_column][/cs_element_layout_row][/cs_element_section][cs_element_section _id=”39″ ][cs_element_row _id=”40″ ][cs_element_column _id=”41″ ][cs_element_image _id=”42″ ][cs_element_image _id=”43″ ][cs_element_gap _id=”44″ ][/cs_element_column][cs_element_column _id=”45″ ][cs_element_image _id=”46″ ][cs_element_image _id=”47″ ][/cs_element_column][/cs_element_row][/cs_element_section][/cs_content]

i 3 Table of Contents

Recent Blogs:

Concrete Lift Techniques for Efficient Foundation Repair

Have you started noticing uneven or sunken concrete around your home or business? Instead of ripping everything out and pouring new slabs, concrete lifting might be the better option. It’s a safe, cost-effective method that restores surface level and structural...

Featured Projects:

About the Author:

Jay Silver

Jay Silver is the Founder and President of Helicon, Florida’s leading geotechnical construction company specializing in foundation repair, soil stabilization, deep foundations, and underpinning solutions.

Under his leadership, Helicon has become one of Florida’s top foundation repair providers and a trusted partner for homeowners, builders, and contractors across the state. Jay is recognized as an expert in geotechnical construction and is active in professional organizations advancing the industry.