The project is a commercial resort pool in need of pre-construction helical piers for the main pool and pool deck area. Challenge • Soil conditions in FEMA flood zone Solution Helicon worked alongside the geotechnical design team to develop a pre-construction helical...
The project is a residential luxury pool in need of pre-construction helical piers for the main pool, wading pool, pool deck area, and pavilion. Challenge • Soil conditions Solution Helicon worked alongside the geotechnical design team to develop a pre-construction...
The project is a residential condominium complex that was in need of foundation stabilization. The Geotechnical Engineer of Record recommended a solution of pressure pier underpinning to safely and permanently transfer the weight of the structure onto solid bedrock or...
The project is a residential condominium complex that experienced sinkhole activity. The Geotechnical Engineer of Record recommended a solution of low mobility and high mobility compaction grout and underpinning to improve the load bearing capacity of the existing...
The permeation grout project is at the NASA Kennedy Space Center in Cape Canaveral, FL. This project consisted of ground improvement for a heavily loaded slap stand structure that will be constructed along the transfer aisle between Highbays 3 & 4 in the Vehicle...
Vibro stone columns offer general contractors in the State of Florida, a more sustainable and economical alternative for solid commercial deep foundations as opposed to deep and piling foundation solutions. They are designed with complex engineering techniques and...