Proudly serving all of Florida with offices in Tampa, Orlando, and Fort Myers

Little Road, Trinity, FL Sinkhole

i 3 Table of Contents

Effective Strategies for Seawall Erosion Control

Seawall erosion in Florida weakens coastal defenses, putting properties at risk. Understanding its causes, impacts, and preventive measures is crucial. This guide covers everything from identifying early signs to effective repair strategies for seawall erosion. Key...

Polyjacking: The Best Solution for Uneven Concrete

Polyjacking is a modern method to fix uneven concrete using high-density polyurethane foam. It offers a quick and long-lasting solution for driveways, sidewalks, and patios. Learn how polyjacking works and why it’s often preferred over traditional methods. Key...

Top 5 Ways to Repair Foundation Damage

Experiencing foundation problems like cracks or uneven floors? Learn how to repair foundation damage efficiently. This guide breaks down common issues, causes, and the 5 best repair methods to ensure your home stays safe and sound. Key Takeaways Foundation damage can...

Why Helical Piers Outperform Timber Piles for Builders

Building a solid foundation is the first critical step for any construction project. It sets the stage for the durability and integrity of the entire structure. For decades, timber pile pier and beam systems have been a common choice for builders, especially in areas...

The DIY Battle Against Seawall Soil Erosion

The encroaching waves and the relentless tides often leave Florida homeowners and communities along the coast grappling with a common adversary: seawall soil erosion. In an attempt to shield their land from being swallowed by the...

Why Is Soil Stabilization So Important in Foundation Repair?

Have you ever noticed a slight tilt in your driveway, or perhaps a crack along your concrete patio or sidewalk? Soil stabilization can solve these issues. These may not be random occurrences, but signs of a deeper issue: a compromised soil foundation. Soil stability...

Top Crawl Space Foundation Encapsulation Benefits Explained

Crawl space encapsulation – it’s a term that gets tossed around frequently in home maintenance circles, but what does it really mean? More importantly, how does it affect the health and well-being of those living in the house? The answers to these questions might...

Reinforcing Seawalls with Enduring Seawall Caps

The beauty of waterfront properties is unparalleled, but maintaining their integrity is just as crucial as admiring the view. Have you ever wondered how these properties withstand the constant barrage of waves and tides? The answer lies in the often-overlooked yet...

Residential Pool Deck Stabilization, Tampa, FL

[cs_content][cs_element_section _id="1" ][cs_element_row _id="2" ][cs_element_column _id="3" ][cs_element_headline _id="4" ][cs_content_seo]Residential Pool , Tampa, FL\n\n[/cs_content_seo][/cs_element_column][/cs_element_row][/cs_element_section][cs_element_section...

Contact us anytime!

[cs_content][cs_element_section _id=”1″ ][cs_element_row _id=”2″ ][cs_element_column _id=”3″ ][cs_element_headline _id=”4″ ][cs_content_seo]Little Road, Trinity, FL Sinkhole\n\n[/cs_content_seo][/cs_element_column][/cs_element_row][/cs_element_section][cs_element_section _id=”5″ ][cs_element_row _id=”6″ ][cs_element_column _id=”7″ ][cs_element_video _id=”8″ ][/cs_element_column][cs_element_column _id=”9″ ][cs_element_headline _id=”10″ ][cs_content_seo]Trinity, FL\n\n[/cs_content_seo][cs_element_gap _id=”11″ ][cs_element_text _id=”12″ ][cs_content_seo]CLIENT: Spring Haven Condo Assn.
ENGINEER: Basic Engineering
MARKET: Commercial
SOLUTION: Ground Improvement
SERVICES: Compaction Grout, 
                       Chemical Grout
 \n\n[/cs_content_seo][cs_element_headline _id=”13″ ][cs_content_seo]Sinkhole repair of subsidence on road\n\n[/cs_content_seo][cs_element_headline _id=”14″ ][cs_content_seo]Over 578 cubic yards compaction grout utilized\n\n[/cs_content_seo][cs_element_headline _id=”15″ ][cs_content_seo]Over 6,532 lbs. chemical grout utilized\n\n[/cs_content_seo][cs_element_gap _id=”16″ ][cs_element_button _id=”17″ ][cs_content_seo]Project PDF\n\n[/cs_content_seo][cs_element_social _id=”18″ ][cs_element_social _id=”19″ ][cs_element_social _id=”20″ ][cs_element_social _id=”21″ ][/cs_element_column][/cs_element_row][/cs_element_section][cs_element_section _id=”22″ ][cs_element_layout_row _id=”23″ ][cs_element_layout_column _id=”24″ ][cs_element_text _id=”25″ ][cs_content_seo]Project\n\n[/cs_content_seo][cs_element_text _id=”26″ ][cs_content_seo]The project is a sinkhole that opened up off of Little Road in Trinity, FL. \n\n[/cs_content_seo][/cs_element_layout_column][/cs_element_layout_row][/cs_element_section][cs_element_section _id=”27″ ][cs_element_layout_row _id=”28″ ][cs_element_layout_column _id=”29″ ][cs_element_text _id=”30″ ][cs_content_seo]Challenge\n\n[/cs_content_seo][cs_element_text _id=”31″ ][cs_content_seo]• Sinkhole was directly underneath an existing road and within close proximity to a commercial building.\n\n[/cs_content_seo][/cs_element_layout_column][/cs_element_layout_row][/cs_element_section][cs_element_section _id=”32″ ][cs_element_layout_row _id=”33″ ][cs_element_layout_column _id=”34″ ][cs_element_text _id=”35″ ][cs_content_seo]Solution\n\n[/cs_content_seo][cs_element_text _id=”36″ ][cs_content_seo]Fill the voids, cracks, fractures, and cavities while stabilizing the granular material and improving the physical properties of the soil and limestone.
The engineer of record recommended a ground improvement plan that consisted of a combination of compaction grouting and chemical grouting points to remediate the sinkhole activity. Approximately 578+ cubic yards of compaction grout injected in 45 points at varying depths ranging from 22 feet to 150 feet below existing grade.  A mixture of cement, fly ash, sand, water, and other admixtures were injected into the loose soils and voids in the limestone and overlying sand strata.
The chemical grouting densified and stabilized the interior shallow soils. A total of 6,523+ lbs. of chemical grout was injected through 116 chemical grout points. Each point was pumped at 12 feet to 6 feet below ground surface until lift of the slab/ground refusal was achieved.
All operations were performed under the observation of the engineer of record. Efficient planning & coordination was key to overcoming the challenges & limitations. \n\n[/cs_content_seo][/cs_element_layout_column][/cs_element_layout_row][/cs_element_section][cs_element_section _id=”37″ ][cs_element_row _id=”38″ ][cs_element_column _id=”39″ ][cs_element_image _id=”40″ ][cs_element_image _id=”41″ ][cs_element_gap _id=”42″ ][/cs_element_column][cs_element_column _id=”43″ ][cs_element_image _id=”44″ ][cs_element_image _id=”45″ ][cs_element_gap _id=”46″ ][/cs_element_column][/cs_element_row][/cs_element_section][/cs_content]