The project is a residential condominium complex that experienced sinkhole activity. The Geotechnical Engineer of Record recommended a solution of low mobility and high mobility compaction grout and underpinning to improve the load bearing capacity of the existing...
The permeation grout project is at the NASA Kennedy Space Center in Cape Canaveral, FL. This project consisted of ground improvement for a heavily loaded slap stand structure that will be constructed along the transfer aisle between Highbays 3 & 4 in the Vehicle...
The compaction grout project is a nuclear power plant located in Crystal River, FL. This project consisted of the design and construction of a new Wastewater Treatment (WWT) system for flue gas desulfurization (FDG) blowdown water prior to disposal into the existing...
The project is a single-story, metal frame, office building with stucco cover, interior steel pipe column supports, and post tension cable reinforced slab. The building has undergone significant subsidence due to organic soil layers. The Geotechnical Engineer of...
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.