Have you ever wondered how water damage can silently weaken your home's foundation? What starts as a puddle near your wall could end up costing you thousands in structural repairs. When water seeps into the ground beneath your house, it can cause the soil to shift,...
Helical Piers: Sirata Beach Hotel, St. Pete Beach, FL
The project is a commercial resort pool in need of pre-construction helical piers for the main pool and pool deck area.
Challenge
• Soil conditions in FEMA flood zone
Solution
Helicon worked alongside the geotechnical design team to develop a pre-construction helical pier program designed to meet the building code load criteria. The helical pier system was installed to a competent bearing stratum as defined by the engineer. A total of 56 helical piers were installed during the course of this project. The helical piers were installed below the surface for a running average of 12 ft below existing wall footing elevation. The helical piers were documented to have sufficient uplift resistance capacity, as measured and correlated by installation torques for the helical piers. Efficient planning & coordination was key to overcoming the challenges & limitations. Helicon collaborated with the Geotechnical Engineer of Record throughout the work and confirmed all recommended criteria were followed.