Polyurethane Chemical Grout: Concrete Slab Lift, St. Petersburg, FL
[cs_content][cs_element_section _id=”1″ ][cs_element_row _id=”2″ ][cs_element_column _id=”3″ ][cs_element_headline _id=”4″ ][/cs_element_column][/cs_element_row][/cs_element_section][cs_element_section _id=”5″ ][cs_element_row _id=”6″ ][cs_element_column _id=”7″ ][cs_element_video _id=”8″ ][cs_element_gap _id=”9″ ][/cs_element_column][cs_element_column _id=”10″ ][cs_element_headline _id=”11″ ][cs_element_gap _id=”12″ ][cs_element_text _id=”13″ ][cs_element_gap _id=”14″ ][cs_element_headline _id=”15″ ][cs_element_headline _id=”16″ ][cs_element_headline _id=”17″ ][cs_element_gap _id=”18″ ][cs_element_button _id=”19″ ][cs_element_social _id=”20″ ][cs_element_social _id=”21″ ][cs_element_social _id=”22″ ][cs_element_social _id=”23″ ][/cs_element_column][/cs_element_row][/cs_element_section][cs_element_section _id=”24″ ][cs_element_layout_row _id=”25″ ][cs_element_layout_column _id=”26″ ][cs_element_text _id=”27″ ][cs_element_text _id=”28″ ][/cs_element_layout_column][/cs_element_layout_row][/cs_element_section][cs_element_section _id=”29″ ][cs_element_layout_row _id=”30″ ][cs_element_layout_column _id=”31″ ][cs_element_text _id=”32″ ][cs_element_text _id=”33″ ][/cs_element_layout_column][/cs_element_layout_row][/cs_element_section][cs_element_section _id=”34″ ][cs_element_layout_row _id=”35″ ][cs_element_layout_column _id=”36″ ][cs_element_text _id=”37″ ][cs_element_text _id=”38″ ][/cs_element_layout_column][/cs_element_layout_row][/cs_element_section][cs_element_section _id=”39″ ][cs_element_row _id=”40″ ][cs_element_column _id=”41″ ][cs_element_image _id=”42″ ][cs_element_image _id=”43″ ][cs_element_gap _id=”44″ ][/cs_element_column][cs_element_column _id=”45″ ][cs_element_image _id=”46″ ][cs_element_image _id=”47″ ][/cs_element_column][/cs_element_row][/cs_element_section][/cs_content][cs_content_seo]Maximo Marina Project
Tampa, FL
CLIENT: Maximo Marina
MARKET: Commercial
SOLUTION: Ground Improvement
SERVICE: Poly Foam Chemical Grouting
Ground improvement for marina
2,451+ pounds of chemical grout injected
73 grout injection points
Project PDF
Project
Maximo Marina is a marina located in St. Petersburg, Florida. The structure is comprised of a one-story commercial office building with amenities located on the water. The office building was experiencing settlement from soil erosion caused by the incoming and outgoing tide. The client’s interest was to quickly preserve and make the office building safe. Their long-term plan is to eventually build a new office building. Foundation repair and ground improvement utilizing a one-part permeation and two-part poly foam chemical grout were specified to support the building loads and seal the exterior foundation.
Challenge
The project posed several challenges:• Completing interior and exterior work while office staff and marina remained open. • Tight confined workspaces inside the office building• Setting up containment barriers to catch any chemical grout that may enter the water • Environmentally friendly chemical grouting needed due to proximity to water
Solution
A chemical grout plan was designed to meet the design load criteria, fill voids and seal the exterior foundation of the building. Helicon’s chemical grout crew worked over a 3 day period to complete this project. Efficient planning & coordination was key to overcoming any challenges and limitations. 25 .±. gallons of one-part permeation grout injected into a total of thirty-five (35) grout points along the interior perimeter of the west end of the of the structure. A total of 2,451.3 .±. pounds of two-part chemical grout were injected into a total of thirty-eight (38) points in the interior of the west end of the structure. The project was finished on-time and within budget.