Ground Improvement for a new community center
Over 1,500 cubic yards of grouting utilized at an approximate depth of 25 ft.
The Project
The Challenge
The Solution
FREE INSPECTION REQUEST
Client: R.L. Burns Inc
Market: Commercial
Solution: Ground Improvement
Services: Compaction Grout
The project is new construction two story community center building (Mary Sue Rich Community Center) located in the City of Ocala. The building is to be 30 ft tall with a footprint of approximately 33,000 sq ft. The proposed building was in need of ground improvement before the construction of the building commenced.
The engineer of record recommended a ground improvement plan that consisted of approximately 1,500 cubic yards of compaction grout injected at an average depth of 25 ft. per injection point. Primary injection points were installed an about a 15 ft triangular pattern beneath the proposed building plus one row of grout injections beyond the perimeter. Secondary injection points were placed at mid-distances between primary injection points. Ground injection pipes were installed to the surface of the rock and then incrementally withdrawn at 2 ft intervals while pumping low-slump grout.
Deep compaction grouting operations were performed under the observation of the engineer of record. Post grouting borings were performed to evaluate the effectiveness of the compaction grouting program. Efficient planning & coordination was key to overcoming the challenges & limitations.