When Excavation Gets Tight, Think Beyond Sheet Piles Excavating near an existing structure — like a home, commercial building, or utility line — often requires soil support to avoid collapse or damage. For decades, the go-to solution has been sheet piling: driving...
Underpinning and Poly Foam Foundation Lift: Lutz, FL
The project is a two-story, wood frame, residential home. The building has undergone subsidence in a corner of the foundation due to organic soil layer deterioration.
Challenge
• Two different procedures (Underpinning and Poly Foam) were needed to be completed in order to repair foundation.
• An 8 inch foundation lift was needed to repair foundation.
Solution
Helicon developed an underpinning simultaneous lift procedure with poly foam lift as the remedy to the situation. The underpins were installed and hydraulically lifted the sunken foundation 8 inches. The poly foam injections were done after the underpinning to fill in any gaps beneath footer or above footer. This solution was designed to meet or exceed the design load criteria for the building. Efficient planning & coordination was key to overcoming the challenges & limitations. 140+/-pounds of polyurethane material were injected into a total of 13 chemical grout points on the exterior of the structure. The underpinning and poly foam injection work was completed on time and within budget.