Proudly serving all of Florida with offices in Tampa, Orlando, and Fort Myers

  • Helicon
  • 9
  • Pre-Construction Helical Piers: Retail Mixed-Use Building, Naples, FL

The Collective Project

Naples, FL

Client: Deangelis Diamond

Market: Retail

Solution: Deep Foundation

Services: Helical Piers

Deep foundation for 3-story commercial building with parking garage Installation of 226 Galvanized Helical Piers Helical piers drilled to an average depth of 25 ft

The Project

The project consisted of a deep foundation system for a 3-story mixed use building with garage. Installation of two hundred and twenty six (226) galvanized helical piers to support the foundation system. Hard gray limestone rock was found from around 22 feet to around 34 feet below ground surface.

The Challenge

The challenges encountered during helical pier installation were minimal

  • Critical path construction schedule

The Solution

The foundation system for The Collective building was designed for a maximum net soil bearing pressure of 2,500 pounds per square foot (psf} for code dead and live loads plus any short duration loading for the continuous wall footings Based on the installation torque or spinning on competent cemented shell or limestone layers, all helical piers have satisfied and exceeded an allowable load bearing capacity of 22 kips. Work finished on-time and within budget.

Free Inspection Request Helicon

Name(Required)
Address
This field is hidden when viewing the form