Helicon worked alongside the geotechnical design team to develop a helical pier program designed to meet the building code load criteria. Helical Piers were installed to allow the General Contractor to utilize standard shallow footing construction, saving considerable time and cost. Helical piles require zero time after installation to load vs Auger Cast Piles, Micro Piles and they are more economical. Efficient planning & coordination was key to overcoming the challenges & limitations. Helicon collaborated with the Geotechnical Engineer of Record throughout the work and confirmed all recommended criteria were followed.