The project is a residential condominium complex that experienced sinkhole activity. The Geotechnical Engineer of Record recommended a solution of low mobility and high mobility compaction grout and underpinning to improve the load bearing capacity of the existing soils at the site. The intent of grouting operations was to seal the surface of the limestone, fill voids and stabilize weakened soils that underlie the building footprint. Due to a ground cover collapse that occurred in front of one of the buildings, underpinning needed to be utilized for preventative purposes prior to compaction grouting at this building.